// Data centres
High-count fibre for data centres and hyperscale programmes.
Specialist fibre installation, splicing, testing, migrations and maintenance for data centre delivery partners. Our New South Wales operation combines high-count fibre capability with the hauling, network construction and restoration resources needed beyond the facility boundary.

Selected programme experience.
Delivered by our NSW team as a specialist subcontractor through appointed contractors and delivery partners.
-
70,000+
Fibre cores in three months
Spliced and tested on a hyperscale ribbon programme, with full bidirectional OTDR and insertion-loss testing.
-
20,000+
Cores in 30 days
Completed on a data centre splice-and-test programme, with stranded and ribbon teams working at the same time.
-
80+
Runs of 864-fibre cable
AFL Spider Web ribbon cable spliced, tested and certified on a specialist data centre programme.
-
6,912
Fibres per tie cable
Our highest-count tie-cable work, with ribbon and stranded teams deployed together where required.
// Why we fit
Built for dense, technical, time-sensitive environments.
Disciplined cable preparation, repeatable splice quality, clean labelling and secure-site behaviour. Delivered as a specialist subcontractor to head contractors and delivery partners.

Four ways to engage us.
Splicing and patching
High-count jointing, mass fusion, patch panels, labelling.
Testing and certification
OTDR, insertion loss, MPO/MTP, certified results.
Migration and cutover
Identification, staging, execution, verification.
Maintenance and fault response
Planned maintenance and emergency restoration under contract.
// Fibre formats
The formats we splice and test.
Stranded single-mode and multimode
Conventional ribbon fibre
12-fibre mass-fusion ribbon
AFL Spider Web ribbon
Prysmian rollable ribbon
High-count tie cables
MPO/MTP structured cabling
ISP and OSP interfaces
Patch panels, LGX, wallboxes
How we run a high-count programme.
01
Programme review
Cable types, counts, splice architecture, acceptance criteria.
02
Mobilisation
Crews, equipment, inductions and secure-site access.
03
Production
Prep, splice, patch, label, test, close out.
04
Verification
Traces, loss results, end-face condition, exceptions.
05
Handover
Certification, workbooks, as-builts, close-out evidence.
// Discuss a data centre programme